10/02/2026
COMPLETING ONE OF THE TALLEST STEEL STRUCTURE BUILDINGS AT THE HOA PHAT DUNG QUAT PROJECT
HGPT Steel has officially completed the contract for the fabrication and erection of the steel structure for Block 3 – Lime Workshop at Hoa Phat Dung Quat. As one of the tallest steel structure buildings within the project, the 8-story steel workshop, with a total weight of over 1,100 tons, required a high level of precision in both fabrication and installation.
16/10/2025
THE FIRST STEEL TRUSSES FOR TWO WAREHOUSES OF THE HOA VANG LOGISTICS PROJECT ARE TAKING SHAPE
The working atmosphere at HGPT STEEL’s factory has become vibrant in the early days of Q4, as the first steel trusses for Warehouses No. 02 and 03 under the Hoa Vang Logistics Center – Da Nang Port Project have officially entered the fabrication phase.
Read this post16/09/2025
Kaizen – 5S awareness training session at HGPT Steel
At HGPT Steel, we believe that a neat, clean, and well-organized factory is the foundation of a safe and productive working environment. Therefore, on September 13, the Occupational Safety – 5S Committee, in collaboration with the Kaizen Team, organized an awareness training session for all production staff on the significance and importance of 5S in creating an effective workplace.
Read this post18/08/2025
HGPT PROVIDES KINGPOST STEEL STRUCTURES FOR SUNSEA TOWER DA NANG APARTMENT PROJECT
Sunsea Tower, also known as Vuong Thua Vu Twin Towers, is a luxury apartment project by Sun Group in Da Nang. The development features two 25-storey towers located on the prime Vuong Thua Vu street, just 300 meters from My Khe Beach.
Read this post31/07/2025
HGPT IS HONORED TO CONTINUE TO BE TRUSTED BY HOA PHAT TO ASSIGN THE STEEL STRUCTURE CONSTRUCTION PACKAGE FOR WAREHOUSE F
Building on the success of previous packages, HGPT has once again been entrusted by Hoa Phat Dung Quat to execute the steel structure package for Warehouse F – General Port.
Read this post21/07/2025
CONTRACT SIGNING CEREMONY OF THE PACKAGE “PRODUCTION AND INSTALLATION OF STEEL STRUCTURES OF RAICO VIETNAM FACTORY”
On the afternoon of July 18, 2025, the contract signing ceremony for the package “Fabrication and Installation of Steel Structures for the Raico Vietnam Factory Project” took place between Raico Vietnam Co., Ltd. and Ha Giang Phuoc Tuong Mechanical JSC. The project covers an area of more than 36,000 m² at the Tam Hiep Port Logistics Industrial Park.
Read this post20/05/2025
HGPT Steel conquered a steel structure frame with a span of over 100 meters
Steel structural frames with a span of over 100 meters require high precision and sophisticated fabrication techniques. To create a strong and stable steel truss system, every stage — from pipe bending and assembly to welding — must be carried out meticulously, ensuring that each detail meets technical standards.
Read this post
CONTACT US NOW
We are committed to partnering with businesses, contractors, and investors to deliver projects of quality – sustainability – and on schedule.
