10/02/2026

COMPLETING ONE OF THE TALLEST STEEL STRUCTURE BUILDINGS AT THE HOA PHAT DUNG QUAT PROJECT

HGPT Steel has officially completed the contract for the fabrication and erection of the steel structure for Block 3 – Lime Workshop at Hoa Phat Dung Quat. As one of the tallest steel structure buildings within the project, the 8-story steel workshop, with a total weight of over 1,100 tons, required a high level of precision in both fabrication and installation.

Read this post

16/10/2025

THE FIRST STEEL TRUSSES FOR TWO WAREHOUSES OF THE HOA VANG LOGISTICS PROJECT ARE TAKING SHAPE

The working atmosphere at HGPT STEEL’s factory has become vibrant in the early days of Q4, as the first steel trusses for Warehouses No. 02 and 03 under the Hoa Vang Logistics Center – Da Nang Port Project have officially entered the fabrication phase.

Read this post

16/09/2025

Kaizen – 5S awareness training session at HGPT Steel

At HGPT Steel, we believe that a neat, clean, and well-organized factory is the foundation of a safe and productive working environment. Therefore, on September 13, the Occupational Safety – 5S Committee, in collaboration with the Kaizen Team, organized an awareness training session for all production staff on the significance and importance of 5S in creating an effective workplace.

Read this post

18/08/2025

HGPT PROVIDES KINGPOST STEEL STRUCTURES FOR SUNSEA TOWER DA NANG APARTMENT PROJECT

Sunsea Tower, also known as Vuong Thua Vu Twin Towers, is a luxury apartment project by Sun Group in Da Nang. The development features two 25-storey towers located on the prime Vuong Thua Vu street, just 300 meters from My Khe Beach.

Read this post

31/07/2025

HGPT IS HONORED TO CONTINUE TO BE TRUSTED BY HOA PHAT TO ASSIGN THE STEEL STRUCTURE CONSTRUCTION PACKAGE FOR WAREHOUSE F

Building on the success of previous packages, HGPT has once again been entrusted by Hoa Phat Dung Quat to execute the steel structure package for Warehouse F – General Port.

Read this post

21/07/2025

CONTRACT SIGNING CEREMONY OF THE PACKAGE “PRODUCTION AND INSTALLATION OF STEEL STRUCTURES OF RAICO VIETNAM FACTORY”

On the afternoon of July 18, 2025, the contract signing ceremony for the package “Fabrication and Installation of Steel Structures for the Raico Vietnam Factory Project” took place between Raico Vietnam Co., Ltd. and Ha Giang Phuoc Tuong Mechanical JSC. The project covers an area of more than 36,000 m² at the Tam Hiep Port Logistics Industrial Park.

Read this post

20/05/2025

HGPT Steel conquered a steel structure frame with a span of over 100 meters

Steel structural frames with a span of over 100 meters require high precision and sophisticated fabrication techniques. To create a strong and stable steel truss system, every stage — from pipe bending and assembly to welding — must be carried out meticulously, ensuring that each detail meets technical standards.

Read this post

CONTACT US NOW

We are committed to partnering with businesses, contractors, and investors to deliver projects of quality – sustainability – and on schedule.