20/05/2025

GREEN SPACE – POSITIVE ENERGY SOURCE FOR HGPT

At HGPT, we believe that an effective working environment is not only built on modern production lines, but also on the balance between work and everyday living space. Alongside our large-capacity steel structure fabrication workshop equipped with advanced machinery, we invest in creating “green” areas – from tree-lined corridors to small gardens – where employees can rest and recharge after intense working hours.

Incorporating greenery and open spaces into the factory premises not only helps improve air quality but also reduces stress, creating a sense of relaxation and comfort for workers. Studies have shown that exposure to nature in the workplace can reduce stress, enhance concentration, and sustain positive energy throughout the day.

Every tree, lawn, and stone bench on HGPT’s premises reflects our consistent efforts and philosophy of harmonious development between people, technology, and the living environment. This is also part of our sustainable development commitment: to create not only high-quality mechanical products, but also a friendly and supportive workplace for all our employees.

Subscribe to HGPT STEEL Newsletter

Get the latest updates on projects, products, and company activities from HGPT STEEL. Take a look

    Related news

    10/02/2026

    COMPLETING ONE OF THE TALLEST STEEL STRUCTURE BUILDINGS AT THE HOA PHAT DUNG QUAT PROJECT

    HGPT Steel has officially completed the contract for the fabrication and erection of the steel structure for Block 3 – Lime Workshop at Hoa Phat Dung Quat. As one of the tallest steel structure buildings within the project, the 8-story steel workshop, with a total weight of over 1,100 tons, required a high level of precision in both fabrication and installation.

    Read this post

    06/02/2026

    HGPT STEEL KICKS OFF A PROMISING 2026 WITH AN FDI PROJECT

    Entering 2026, HGPT STEEL continues to affirm its position by launching an FDI project – the Freeze-Dried Coffee Factory at Becamex Binh Dinh Industrial Park. This milestone marks a significant achievement, demonstrating HGPT STEEL’s capability, credibility, and extensive experience in the manufacturing and erection of pre-engineered steel buildings.

    Read this post

    15/01/2026

    ACCELERATING THE COMPLETION OF STEEL STRUCTURE FABRICATION FOR SLUICE GATES TRA KHUC 1 HYDROPOWER PROJECT – QUANG NGAI

    To ensure progress and meet the EPC contractor’s plan for commissioning and grid connection of the Tra Khuc 1 Hydropower Project, all fabrication works for the sluice gate steel structures are currently being expedited at Factory No. 1 and No. 2.

    Read this post

    07/01/2026

    [PROJECT UPDATE] HOA VANG LOGISTICS CENTER DA NANG – WAREHOUSE NO. 02

    At the construction site of the Hoa Vang Logistics Center Project – Da Nang Port, the first steel structural components of Warehouse No. 02, fabricated by HGPT STEEL, are being transported, erected, and progressively completed in accordance with the approved schedule. Each work item reflects precision in fabrication, consistency in design, and professionalism in steel structure erection works.

    Read this post

    31/10/2025

    HGPT STEEL WELCOMES THE SAN DIEGO PORT DELEGATION (USA) FOR THE SECOND VISIT

    On October 30, 2025, HGPT STEEL was honored to welcome the San Diego Port delegation for their second visit and working session at our factory. During the meeting, both sides discussed import–export policies, logistics cooperation opportunities, and HGPT’s steel structure production and export capabilities.

    Read this post

    20/10/2025

    HGPT STEEL ADVANCES WITH ISO 3834 STANDARD

    On October 22–23, 2024, HGPT STEEL held a working session with the international certification and auditing organization BUREAU VERITAS VIETNAM to conduct an assessment and evaluation for the ISO 3834 certification.

    Read this post

    17/10/2025

    PROJECT PROGRESS UPDATE – WAREHOUSE F, HOA PHAT DUNG QUAT 2

    HGPT STEEL is currently executing the steel structure package for Warehouse Cluster F under the Hoa Phat Dung Quat 2 Project, covering a total area of 17 hectares with a fabrication and installation volume exceeding 2,000 tons of steel.

    Read this post

    16/10/2025

    THE FIRST STEEL TRUSSES FOR TWO WAREHOUSES OF THE HOA VANG LOGISTICS PROJECT ARE TAKING SHAPE

    The working atmosphere at HGPT STEEL’s factory has become vibrant in the early days of Q4, as the first steel trusses for Warehouses No. 02 and 03 under the Hoa Vang Logistics Center – Da Nang Port Project have officially entered the fabrication phase.

    Read this post

    CONTACT US NOW

    We are committed to partnering with businesses, contractors, and investors to deliver projects of quality – sustainability – and on schedule.