20/05/2025

HGPT CONTINUES TO BE TRUSTED BY HOA PHAT TO ASSIGN THE STEEL STRUCTURE CONTRACTING PACKAGE FOR 8-STOREY FACTORY

Multi-storey steel structures are becoming a design trend thanks to their ability to optimize space and improve operational efficiency. As a company that always pioneers new trends, HGPT Mechanical has once again been entrusted by Hoa Phat Dung Quat to execute the 8-storey steel structure package – Steel Structure Block 3 of the Lime Workshop.

 

With a total volume of over 1,100 tons, including many large components requiring high precision in fabrication and erection, HGPT leverages its long-standing experience and capabilities to deliver high-quality, durable projects that contribute to the growth of our clients.

Project Information:
Scope of work: Fabrication, supply, and installation of steel structures for Block 3 – Lime Workshop
Project name: Hoa Phat Dung Quat Iron & Steel Complex – Phase 2
Location: Binh Son, Quang Ngai Province
Investor: Hoa Phat Dung Quat Steel JSC
—————————————

Contact information:

– HA GIANG PHUOC TUONG STEEL JSC (HGPT Steel)

– H.O. & Workshop: No.8 street, Hoa Cam Industrial Zone, Da Nang

– Hotline: 0949.386.113

– Mail: info@hgpt.vn – Website: https://hgptsteel.com/

– Fanpage: https://www.facebook.com/HGPTMechanicalJSC

Subscribe to HGPT STEEL Newsletter

Get the latest updates on projects, products, and company activities from HGPT STEEL. Take a look

    Related news

    20/10/2025

    HGPT STEEL ADVANCES WITH ISO 3834 STANDARD

    On October 22–23, 2024, HGPT STEEL held a working session with the international certification and auditing organization BUREAU VERITAS VIETNAM to conduct an assessment and evaluation for the ISO 3834 certification.

    Read this post

    17/10/2025

    PROJECT PROGRESS UPDATE – WAREHOUSE F, HOA PHAT DUNG QUAT 2

    HGPT STEEL is currently executing the steel structure package for Warehouse Cluster F under the Hoa Phat Dung Quat 2 Project, covering a total area of 17 hectares with a fabrication and installation volume exceeding 2,000 tons of steel.

    Read this post

    16/10/2025

    THE FIRST STEEL TRUSSES FOR TWO WAREHOUSES OF THE HOA VANG LOGISTICS PROJECT ARE TAKING SHAPE

    The working atmosphere at HGPT STEEL’s factory has become vibrant in the early days of Q4, as the first steel trusses for Warehouses No. 02 and 03 under the Hoa Vang Logistics Center – Da Nang Port Project have officially entered the fabrication phase.

    Read this post

    16/09/2025

    Kaizen – 5S awareness training session at HGPT Steel

    At HGPT Steel, we believe that a neat, clean, and well-organized factory is the foundation of a safe and productive working environment. Therefore, on September 13, the Occupational Safety – 5S Committee, in collaboration with the Kaizen Team, organized an awareness training session for all production staff on the significance and importance of 5S in creating an effective workplace.

    Read this post

    18/08/2025

    HGPT PROVIDES KINGPOST STEEL STRUCTURES FOR SUNSEA TOWER DA NANG APARTMENT PROJECT

    Sunsea Tower, also known as Vuong Thua Vu Twin Towers, is a luxury apartment project by Sun Group in Da Nang. The development features two 25-storey towers located on the prime Vuong Thua Vu street, just 300 meters from My Khe Beach.

    Read this post

    31/07/2025

    HGPT IS HONORED TO CONTINUE TO BE TRUSTED BY HOA PHAT TO ASSIGN THE STEEL STRUCTURE CONSTRUCTION PACKAGE FOR WAREHOUSE F

    Building on the success of previous packages, HGPT has once again been entrusted by Hoa Phat Dung Quat to execute the steel structure package for Warehouse F – General Port.

    Read this post

    21/07/2025

    CONTRACT SIGNING CEREMONY OF THE PACKAGE “PRODUCTION AND INSTALLATION OF STEEL STRUCTURES OF RAICO VIETNAM FACTORY”

    On the afternoon of July 18, 2025, the contract signing ceremony for the package “Fabrication and Installation of Steel Structures for the Raico Vietnam Factory Project” took place between Raico Vietnam Co., Ltd. and Ha Giang Phuoc Tuong Mechanical JSC. The project covers an area of more than 36,000 m² at the Tam Hiep Port Logistics Industrial Park.

    Read this post

    20/05/2025

    HGPT Steel conquered a steel structure frame with a span of over 100 meters

    Steel structural frames with a span of over 100 meters require high precision and sophisticated fabrication techniques. To create a strong and stable steel truss system, every stage — from pipe bending and assembly to welding — must be carried out meticulously, ensuring that each detail meets technical standards.

    Read this post

    CONTACT US NOW

    We are committed to partnering with businesses, contractors, and investors to deliver projects of quality – sustainability – and on schedule.