10/02/2026

COMPLETING ONE OF THE TALLEST STEEL STRUCTURE BUILDINGS AT THE HOA PHAT DUNG QUAT PROJECT

HGPT Steel has officially completed the contract for the fabrication and erection of the steel structure for Block 3 – Lime Workshop at Hoa Phat Dung Quat. As one of the tallest steel structure buildings within the project, the 8-story steel workshop, with a total weight of over 1,100 tons, required a high level of precision in both fabrication and installation.

We sincerely thank Hoa Phat Dung Quat Steel Joint Stock Company for their trust and cooperation. This milestone further affirms HGPT Steel’s capability, credibility, and the continued confidence of the Hoa Phat Group in HGPT’s role in large-scale industrial projects.

Project Information:
– Scope of work: Fabrication, supply, and installation of steel structures for Block 3 – Lime Workshop
– Project name: Hoa Phat Dung Quat Integrated Iron and Steel Complex – Phase 2
– Location: Binh Son, Quang Ngai
– Investor: Hoa Phat Dung Quat Steel Joint Stock Company

Contact information:

HA GIANG PHUOC TUONG MECHANICAL JSC (HGPT Steel)

– Address: 8th, Hoa Cam industrial zone, Cam Le ward, Danang Da Nang

– Hotline: 0949.386.113

– Mail: info@hgpt.vn – Website: https://hgptsteel.com/

– Fanpage: https://www.facebook.com/HGPTMechanicalJSC

Subscribe to HGPT STEEL Newsletter

Get the latest updates on projects, products, and company activities from HGPT STEEL. Take a look

    Related news

    06/02/2026

    HGPT STEEL KICKS OFF A PROMISING 2026 WITH AN FDI PROJECT

    Entering 2026, HGPT STEEL continues to affirm its position by launching an FDI project – the Freeze-Dried Coffee Factory at Becamex Binh Dinh Industrial Park. This milestone marks a significant achievement, demonstrating HGPT STEEL’s capability, credibility, and extensive experience in the manufacturing and erection of pre-engineered steel buildings.

    Read this post

    15/01/2026

    ACCELERATING THE COMPLETION OF STEEL STRUCTURE FABRICATION FOR SLUICE GATES TRA KHUC 1 HYDROPOWER PROJECT – QUANG NGAI

    To ensure progress and meet the EPC contractor’s plan for commissioning and grid connection of the Tra Khuc 1 Hydropower Project, all fabrication works for the sluice gate steel structures are currently being expedited at Factory No. 1 and No. 2.

    Read this post

    07/01/2026

    [PROJECT UPDATE] HOA VANG LOGISTICS CENTER DA NANG – WAREHOUSE NO. 02

    At the construction site of the Hoa Vang Logistics Center Project – Da Nang Port, the first steel structural components of Warehouse No. 02, fabricated by HGPT STEEL, are being transported, erected, and progressively completed in accordance with the approved schedule. Each work item reflects precision in fabrication, consistency in design, and professionalism in steel structure erection works.

    Read this post

    31/10/2025

    HGPT STEEL WELCOMES THE SAN DIEGO PORT DELEGATION (USA) FOR THE SECOND VISIT

    On October 30, 2025, HGPT STEEL was honored to welcome the San Diego Port delegation for their second visit and working session at our factory. During the meeting, both sides discussed import–export policies, logistics cooperation opportunities, and HGPT’s steel structure production and export capabilities.

    Read this post

    20/10/2025

    HGPT STEEL ADVANCES WITH ISO 3834 STANDARD

    On October 22–23, 2024, HGPT STEEL held a working session with the international certification and auditing organization BUREAU VERITAS VIETNAM to conduct an assessment and evaluation for the ISO 3834 certification.

    Read this post

    17/10/2025

    PROJECT PROGRESS UPDATE – WAREHOUSE F, HOA PHAT DUNG QUAT 2

    HGPT STEEL is currently executing the steel structure package for Warehouse Cluster F under the Hoa Phat Dung Quat 2 Project, covering a total area of 17 hectares with a fabrication and installation volume exceeding 2,000 tons of steel.

    Read this post

    16/10/2025

    THE FIRST STEEL TRUSSES FOR TWO WAREHOUSES OF THE HOA VANG LOGISTICS PROJECT ARE TAKING SHAPE

    The working atmosphere at HGPT STEEL’s factory has become vibrant in the early days of Q4, as the first steel trusses for Warehouses No. 02 and 03 under the Hoa Vang Logistics Center – Da Nang Port Project have officially entered the fabrication phase.

    Read this post

    16/09/2025

    Kaizen – 5S awareness training session at HGPT Steel

    At HGPT Steel, we believe that a neat, clean, and well-organized factory is the foundation of a safe and productive working environment. Therefore, on September 13, the Occupational Safety – 5S Committee, in collaboration with the Kaizen Team, organized an awareness training session for all production staff on the significance and importance of 5S in creating an effective workplace.

    Read this post

    CONTACT US NOW

    We are committed to partnering with businesses, contractors, and investors to deliver projects of quality – sustainability – and on schedule.