23/09/2025
05 STANDARD STEPS FOR ERECTING A PRE-ENGINEERED STEEL BUILDING
Pre-engineered steel buildings are one of the most efficient construction methods in terms of both schedule and cost. With a construction time reduced to just one-third compared to conventional reinforced concrete structures, the fabrication and erection process of a pre-engineered steel building goes through five main stages: foundation bolt installation, main frame erection, roof sheeting installation, wall sheeting installation, and finishing works.
Read this post24/11/2025
6 Methods for Fixing Roof Leaks in Industrial Workshops
Vietnam’s weather, with heavy rainfall during the rainy season, can significantly impact buildings constructed with metal roofing sheets. If the roofing system is not properly installed or lacks adequate maintenance, it can lead to serious damage. Therefore, reinforcing metal roofs with appropriate anti-leak solutions from the beginning will help increase durability and improve resistance to harsh weather conditions.
Read this post05/11/2025
Overview of Envelope Structure Systems for Factories and Industrial Buildings
Industrial factories are typically constructed using pre-engineered steel structures. In addition to the load-bearing steel frame, the building envelope system is an essential component.
Read this post31/10/2025
HGPT STEEL WELCOMES THE SAN DIEGO PORT DELEGATION (USA) FOR THE SECOND VISIT
On October 30, 2025, HGPT STEEL was honored to welcome the San Diego Port delegation for their second visit and working session at our factory. During the meeting, both sides discussed import–export policies, logistics cooperation opportunities, and HGPT’s steel structure production and export capabilities.
Read this post21/10/2025
SHOT BLASTING – SURFACE PREPARATION OF STEEL STRUCTURES BEFORE PAINTING AT HGPT STEEL
Surface preparation is a critical stage in the construction and maintenance of steel structure projects. Proper surface treatment ensures not only the aesthetics but also the durability and corrosion resistance of steel components.
Read this post20/10/2025
HGPT STEEL ADVANCES WITH ISO 3834 STANDARD
On October 22–23, 2024, HGPT STEEL held a working session with the international certification and auditing organization BUREAU VERITAS VIETNAM to conduct an assessment and evaluation for the ISO 3834 certification.
Read this post17/10/2025
PROJECT PROGRESS UPDATE – WAREHOUSE F, HOA PHAT DUNG QUAT 2
HGPT STEEL is currently executing the steel structure package for Warehouse Cluster F under the Hoa Phat Dung Quat 2 Project, covering a total area of 17 hectares with a fabrication and installation volume exceeding 2,000 tons of steel.
Read this post
CONTACT US NOW
We are committed to partnering with businesses, contractors, and investors to deliver projects of quality – sustainability – and on schedule.
